| 41 |
HDO 2020 INCINERATOR REVAMPING PJT. |
27Ton/Hr x 49Kg/cm2 |
WASTE HEAT BOILER (2 SETS) |
HYUNDAI OIL BANK |
2019 |
| 40 |
HDO 2020 INCINERATOR REVAMPING PJT. |
120Ton/Hr x 45.5Kg/cm2 |
STEAM SUPERHEATER |
HYUNDAI OIL BANK |
2019 |
| 39 |
GSC-ESR18-1140 NO.2 WHB BOILER |
24Ton/Hr x 30Kg/cm2 |
WASTE HEAT BOILER |
GS CALTEX |
2018 |
| 38 |
S-OIL RUCP PROJECT |
21Ton/Hr x 52Kg/cm2 |
WASTE HEAT BOILER |
HYUNDAI OIL BANK |
2017 |
| 37 |
KARBARA REFINERY PROJECT |
24Ton/Hr x 46Kg/cm2 |
WASTE HEAT BOILER |
SCOP(IRAQ) |
2015 |
| 36 |
UKAN PROJECT |
53Ton/Hr x 47Kg/cm2 |
WASTE HEAT BOILER |
LUKOIL UZBEKISTAN |
2015 |
| 35 |
KNPC CLEAN FUEL PROJECT |
20Ton/Hr x 24Kg/cm2 |
WASTE HEAT BOILER |
KNPC |
2015 |
| 34 |
AEGEAN REFINERY PROJECT (STAR) |
51Ton/Hr x 52Kg/cm2 |
WASTE HEAT BOILER |
SOCAR & TURCAS |
2014 |
| 33 |
SOHAR REFINERY PROJECT (SRIP) |
17Ton/Hr x 49Kg/cm2 |
WASTE HEAT BOILER |
ORPIC |
2014 |
| 32 |
DUNG QUAT REFINERY PROJECT |
2Ton/Hr x 10Kg/cm2 |
WASTE HEAT BOILER |
BINH SON REFINERY |
2014 |
| 31 |
DUNG QUAT REFINERY PROJECT |
0.2Ton/Hr x 10Kg/cm2 |
FINAL CONDENSER |
BINH SON REFINERY |
2014 |
| 30 |
ARL UPGRADATION PROJECT |
1.6Ton/Hr x 28.1 Kg/cm2 |
WASTE HEAT BOILER |
ATTOCK REFINERY LIMITED |
2013 |
| 29 |
IRAQ BADRA OIL FIELD DEVELOPMENT PHASE 2 TRERMAL INCINERATOR PACKAGE |
13.8Ton/Hr x 45 Kg/cm2 |
WASTE HEAT BOILER (2 SETS) |
Gazprom neft badra b.v. |
2013 |
| 28 |
IRAQ BADRA OIL FIELD DEVELOPMENT PHASE 2 REACTION FURNACE PACKAGE |
14Ton/Hr x 45 Kg/cm2 |
WASTE HEAT BOILER (2 SETS) |
Gazprom neft badra b.v. |
2013 |
| 25 |
STC A2 PROJECT REACTION FURNACE PACKAGE |
6.5Ton/Hr x 50Kg/cm2 |
WASTE HEAT BOILER (2 SETS) |
SAMSUNG TOTAL |
2012 |
| 24 |
STC A2 PROJECT THERMAL OXIDIZER PACKAGE |
8.5Ton/Hr x 46Kg/cm2 |
WASTE HEAT BOILER |
SAMSUNG TOTAL |
2012 |
| 23 |
MUSANDAM GAS PLANT PROJECT REACTION FURNACE PACKAGE |
4.7Ton/Hr x 41Kg/cm2 |
WASTE HEAT BOILER |
OOCEP |
2012 |
| 22 |
MUSANDAM GAS PLANT PROJECT THERMAL OXIDIZER PACKAGE |
7.5Ton/Hr x 41Kg/cm2 |
WASTE HEAT BOILER |
OOCEP |
2012 |
| 21 |
SOUTH YOLOTEN GAS FIELD DEVELOPMENT PJT REACTION FURNACE PACKAGE |
39.4Ton/Hr x 50Kg/cm2 |
WASTE HEAT BOILER (4 SETS) |
TRUKMENGAS |
2011 |
| 20 |
SOUTH YOLOTEN GAS FIELD DEVELOPMENT PJT THERMAL OXIDIZER PACKAGE |
74.6Ton/Hr x 50Kg/cm2 |
WASTE HEAT BOILER (4 SETS) |
TRUKMENGAS |
2011 |
| 19 |
GAS DESULFURIZATION PLANT REACTION FURNACE PACKAGE |
73.9Ton/Hr x 55Kg/cm2 |
WASTE HEAT BOILER (2 SETS) |
TRUKMENGAS |
2010 |
| 18 |
GAS DESULFURIZATION PLANT THERMAL OXIDIZER PACKAGE |
118.8Ton/Hr x 55Kg/cm2 |
WASTE HEAT BOILER (2 SETS) |
TRUKMENGAS |
2010 |
| 17 |
RUWAIS REFINERY EXPANSION PROJECT DECOMPOSITION FURNACE PACKAGE |
14.4Ton/Hr x 52Kg/cm2 |
WASTE HEAT BOILER (2 SETS) |
TAKREER |
2011 |
| 16 |
4AA PROJECT INCINERATOR PACKAGE |
8Ton/Hr x 7Kg/cm2 |
WASTE HEAT BOILER |
LG CHEM |
2009 |
| 15 |
HDO #2 HOU PROJECT COMBUSTOR PACKAGE |
36.4Ton/Hr x 54.1 Kg/cm2 |
WASTE HEAT BOILER (2 SETS) |
HYUNDAI OILBANK |
2009 |
| 14 |
HDO #2 HOU PROJECT INCINERATOR PACKAGE |
9Ton/Hr x 54.1Kg/cm2 |
WASTE HEAT BOILER |
HYUNDAI OILBANK |
2009 |
| 13 |
RUWAIS NO.4 NGL PROJECT THERMAL REACTOR PACKAGE |
3.8Ton/Hr x 9Bar |
WASTE HEAT BOILER |
GASCO |
2010 |
| 12 |
GDP THERMAL OXIDIZER PACKAGE |
2.65Ton/Hr x 52Kg/cm2 |
WASTE HEAT BOILER |
TAKREER |
2009 |
| 11 |
GDP REACTOR FURNACE PACKAGE |
10.6Ton/Hr x 52Kg/cm2 |
WASTE HEAT BOILER |
TAKREER |
2009 |
| 10 |
NEW FCC PROJECT INCINERATOR PACKAGE |
95.5Ton/Hr x 48Kg/cm2 |
WASTE HEAT BOILER |
SK ENERGY |
2008 |
| 9 |
NEW FCC PROJECT COMBUSTOR PACKAGE |
41Ton/Hr x 53Kg/cm2 |
WASTE HEAT BOILER (2 SETS) |
SK ENERGY |
2007 |
| 8 |
WASTE WATER INCINERATION SYSTEM |
17Ton/Hr x 45Kg/cm2 |
WASTE HEAT BOILER |
LG MMA |
2006 |
| 7 |
MAN PLANT |
7Ton/Hr x 45Kg/cm2 |
WASTE HEAT BOILER |
YONGSAN CHEMICAL |
2005 |
| 6 |
WASTE HEAT RECOVERY SYSTEM |
15Ton/Hr x 16Kg/cm2 |
WASTE HEAT BOILER |
BORNEO FURNITURE |
2001 |
| 5 |
JC-4 PROJECT |
1Ton/Hr x 20Kg/cm2 |
WASTE HEAT BOILER |
DC CHEMICAL |
2001 |
| 4 |
WASTE GAS INCINERATION |
15Ton/Hr x 45Kg/cm2 |
WASTE HEAT BOILER |
DAENONG PETRO CHEMICAL |
1998 |
| 3 |
WASTE MATERIAL TREATMENT FACILITY |
3Ton/Hr x 15Kg/cm2 |
WASTE HEAT BOILER |
WONKWANG |
1996 |
| 2 |
WASTE MATERIAL TREATMENT FACILITY |
2.5Ton/Hr x 10Kg/cm2 |
WASTE HEAT BOILER |
DAE IL DEV. |
1995 |
| 1 |
WASTE SLUDGE INCINERATION |
2Ton/Hr x 25Kg/cm2 |
WASTE HEAT BOILER |
IL KUK HEAVY IND. |
1992 |