NO. | PROJECT NAME | CAPACITY | DESCRIPTION | CLIENT | REMARK |
---|---|---|---|---|---|
36 | CH NO.2 PROJECT | 1,820 Kg/Hr | WASTE GAS INCINERATOR / WET SCRUBBER SYSTEM |
SK SHOWA DENCO | 2020~ |
35 | RDMP BALIKPAPAN PROJECT | 20,000 Nm3/Hr | WASTE GAS INCINERATOR | PT PERTAMINA | 2020~ |
34 | VOC INCINETATOR | 27,000 Nm3/Hr | VOC GAS INCINERATOR | LOTTE FINE CHEMICAL | 2020~ |
33 | VAM PROJECT | 23,000 Nm3/Hr | WASTE ORGANIC INCINERATOR | LOTTE BP | 2019~ |
32 | SS PROJECT | 1,820 Kg/Hr | WASTE GAS INCINERATOR / WET SCRUBBER SYSTEM |
SK SHOWA DENCO | 2017 |
31 | HCC VCM2 INCINERATOR PROJECT | 8,200 Nm3/Hr | WASTE GAS INCINERATOR | HANWHA CHEMICAL | 2017 |
30 | SOHAR REFINERY PROJECT (SRIP) | 5,000 Nm3/Hr | WASTE GAS INCINERATOR | ORPIC | 2014 |
29 | SAUDI ELASTOMER PROJECT | 9,400 Nm3/Hr | TAIL GAS INCINERATOR (2 UNITS) | SABIC | 2013 |
28 | CO2 INCINERATOR (V.O.C) | 1,100,000 Kcal/Hr | WASTE GAS INCINERATION | KT & G | 2005 |
27 | THERMAL OXIDIZER | 9,000 Nm3/Hr | V.O.C INCINERATION (2 SETS) | LG LCD P7 | 2005 |
26 | WASTE GAS OXIDIZER | 69,000 Kg/Hr | MAN PLANT | YONGSAN CHEMIAL | 2005 |
25 | THERMAL OXIDIZER | 9,000 Nm3/Hr | V.O.C INCINERATION | LG LCD P2 | 2005 |
24 | THERMAL OXIDIZER | 9,000 Nm3/Hr | V.O.C INCINERATION (5 UNITS) | LG LCD P6 | 2003 |
23 | WASTE GAS INC. MODIFICATION | 2,800 Kg/Hr | POLYOL PLANT | BASF KOREA | 2003 |
22 | CO2 INCINERATOR (V.O.C) | 1,100 Kcal/Hr | WASTE GAS INC.FACILITY | KT & G | 2003 |
21 | WASTE GAS INCINERATOR | 1,000 Nm3/Hr | M.D.I PLANT | BASF KOREA | 2003 |
20 | THERMAL OXIDIZER | 9,000 Nm3/Hr | V.O.C INCINERATION | LG LCD P5 #4 | 2002 |
19 | THERMAL OXIDIZER | 9,000 Nm3/Hr | V.O.C INCINERATION | LG LCD P5 #1 | 2002 |
18 | CO2 INCINERATOR (V.O.C) | 1,100,000 Kcal/Hr | WASTE GAS INCINERATION | KT & G | 2002 |
17 | NH3 GAS INCINERATOR | 2.5 Ton/Hr | WASTE MATERIAL TREATMENT FACILITY | DC CHEMICAL | 2001 |
16 | THERMAL OXIDIZER | 9,000 Nm3/Hr | V.O.C INCINERATION | LG LCD P4 #3 | 2001 |
15 | WASTE GAS INCINERATOR | 300 Kg/Hr | WASTE PLASTIC PLANT FACILITY | ROYCO | 2000 |
14 | WASTE GAS INCINERATOR | 6,800 Kg/Hr | EDC / VCM PLANT | HANWHA CHEMICAL | 1999 |
13 | CO2 INCINERATOR (V.O.C) | 1,100,000 Kcal/Hr | WASTE GAS INCINERATION | KT & G | 1998 |
12 | MAN PROJECT INCINERATOR SYSTEM | 22,000,000 Kcal/Hr | WASTE GAS INCINERATION | DAENONG PETRO CHEMICAL | 1998 |
11 | WASTE GAS FLARE STACK BURNER | 100 Nm3/Hr | WASTE GAS INCINERATION | KOREA SYNTHETIC FIBER | 1997 |
10 | WASTE GAS FLARE STACK BURNER | 100 Nm3/Hr | WASTE GAS INCINERATION | S.K IND. | 1996 |
9 | WASTE GAS INCINERATOR & HEAT MEDIUM BOILER SYSTEM | 2,000,000 Kcal/Hr | SOFT PITCH PLANT | DONGSUE CHEMICAL | 1998 |
8 | INCINERATOR AUX. BURNER COMBUSTION SYSTEM | 0.5 Ton/Hr | G-7 PILOT PLANT | KOLON ENG | 1996 |
7 | WASTE GAS FLARE STACK BURNER | 100 Nm3/Hr | WASTE GAS INCINERATION | TAEKWANG IND. | 1995 |
6 | WASTE GAS FLARE STACK BURNER | 150 Nm3/Hr | K-2 PROJECT | SANNAM PETRO CHEMICAL | 1995 |
5 | KIMPO RECLAIMED LAND FLARE STACK | 200 Nm3/Hr | KYENG SUE-DONG RECLAIMED LAND CH4 OIL INCINERATION | KIMPO | 1994 |
4 | FLARE STACK & BURNER | 10,000 Nm3/Hr | COREX FACILITY | POSCO | 1992 |
3 | FLARE STACK & BURNER | 400 Nm3/Hr | WASTE FUME GAS INCINERATION | TEAYOUNG CHEM | 1992 |
2 | CARBON REGENERATION FACILITIES #3,4 | 1,500,000 Kcal/Hr | CARBON REGENERATION FACILITY | POSCO | 1992 |
1 | WASTE FUME INCINERATOR | 3,000,000 Kcal/Hr | CCL LINE FUME GAS INCINERATION | YUNHAB STEEL | 1992 |