HANYANG INDUSTRY

EXPERIENCE

Environment / Incinerator / Boiler

Waste Gas Incinerator
환경설비 / 소각로 / 보일러 Waste Gas Incinerator 사진1
환경설비 / 소각로 / 보일러 Waste Gas Incinerator 사진2
환경설비 / 소각로 / 보일러 Waste Gas Incinerator 사진3
환경설비 / 소각로 / 보일러 Waste Gas Incinerator 사진4
환경설비 / 소각로 / 보일러 Waste Gas Incinerator 사진5
환경설비 / 소각로 / 보일러 Waste Gas Incinerator 사진6
환경설비 / 소각로 / 보일러 Waste Gas Incinerator 사진7
환경설비 / 소각로 / 보일러 Waste Gas Incinerator 사진8
환경설비 / 소각로 / 보일러 Waste Gas Incinerator 사진9

LG CHEMICAL 6AA PROJECT

  • CLIENTLG CHEMICAL / KOREA
  • DATE2018
  • PRODUCTWASTE WATER INCINERATOR
  • CAPACITY18,000 Kg/Hr

GREEN PROJECT

  • CLIENTLOTTE FINE CHEMICAL / KOREA
  • DATE2020
  • PRODUCTVOC INCINERATOR
  • CAPACITY27,000 Nm3/Hr

SS PROJECT

  • CLIENTSK MATERIALS / KOREA
  • DATE2017
  • PRODUCTINCINERATION & WET SCRRUBER SYSTEM
  • CAPACITY1,520 Kg/Hr

TGPC PP / GSU PROJECT

  • CLIENTTURKMENGAS / TURKMENISTAN
  • DATE2017
  • PRODUCTACID GAS INCINERATOR
  • CAPACITY1,200,000 Kcal/Hr

VCM WASTE TREATMENT

  • CLIENTHANHWA CHEMICAL / KOREA
  • DATE2016
  • PRODUCTINCINERATION & HCl RECOVERY
  • CAPACITY50 m3/Day

STC A2 PROJECT

  • CLIENTHANWHA TOTAL / KOREA
  • DATE2012
  • PRODUCTWASTE GAS INCINERATOR
  • CAPACITY2,900,000 Kcal/Hr

MAN PLANT-1

  • CLIENTYONGSAN CHEMICAL / KOREA
  • DATE2005
  • PRODUCTWASTE GAS INCINERATOR
  • CAPACITY69,000 Kg/Hr

WASTE MATERIAL TREATMENT FACILITY

  • CLIENTOCI / KOREA
  • DATE2001
  • PRODUCTNH3 GAS INCINERATOR
  • CAPACITY2,500 Kg/Hr

SKC HPPO PROJECT

  • CLIENTSKC / KOREA
  • DATE2008
  • PRODUCTWASTE GAS / LIQUID INCINERATOR
  • CAPACITY13,000 Kg/Hr, 25,000,000 Kcal/Hr
NO. PROJECT NAME CAPACITY DESCRIPTION CLIENT REMARK
36 CH NO.2  PROJECT 1,820 Kg/Hr WASTE GAS INCINERATOR /
WET SCRUBBER SYSTEM
SK SHOWA DENCO 2020~
35 RDMP BALIKPAPAN PROJECT 20,000 Nm3/Hr WASTE GAS INCINERATOR PT PERTAMINA 2020~
34 VOC INCINETATOR 27,000 Nm3/Hr VOC GAS INCINERATOR LOTTE FINE CHEMICAL 2020~
33 VAM PROJECT 23,000 Nm3/Hr WASTE ORGANIC INCINERATOR LOTTE BP 2019~
32 SS PROJECT 1,820 Kg/Hr WASTE GAS INCINERATOR /
WET SCRUBBER SYSTEM
SK SHOWA DENCO 2017
31 HCC VCM2 INCINERATOR PROJECT 8,200 Nm3/Hr WASTE GAS INCINERATOR HANWHA CHEMICAL 2017
30 SOHAR REFINERY PROJECT (SRIP) 5,000 Nm3/Hr WASTE GAS INCINERATOR ORPIC 2014
29 SAUDI ELASTOMER PROJECT 9,400 Nm3/Hr TAIL GAS INCINERATOR (2 UNITS) SABIC 2013
28 CO2 INCINERATOR (V.O.C) 1,100,000 Kcal/Hr WASTE GAS INCINERATION KT & G 2005
27 THERMAL OXIDIZER 9,000 Nm3/Hr V.O.C INCINERATION (2 SETS) LG LCD P7 2005
26 WASTE GAS OXIDIZER 69,000 Kg/Hr MAN PLANT YONGSAN CHEMIAL 2005
25  THERMAL OXIDIZER 9,000 Nm3/Hr V.O.C INCINERATION LG LCD P2 2005
24  THERMAL OXIDIZER 9,000 Nm3/Hr V.O.C INCINERATION (5 UNITS) LG LCD P6 2003
23  WASTE GAS INC. MODIFICATION 2,800 Kg/Hr POLYOL PLANT BASF KOREA 2003
22  CO2 INCINERATOR (V.O.C) 1,100 Kcal/Hr WASTE GAS INC.FACILITY KT & G 2003
21  WASTE GAS INCINERATOR 1,000 Nm3/Hr M.D.I PLANT BASF KOREA 2003
20 THERMAL OXIDIZER 9,000 Nm3/Hr V.O.C INCINERATION LG LCD P5 #4 2002
19 THERMAL OXIDIZER 9,000 Nm3/Hr V.O.C INCINERATION LG LCD P5 #1 2002
18 CO2 INCINERATOR (V.O.C) 1,100,000 Kcal/Hr WASTE GAS INCINERATION KT & G 2002
17 NH3 GAS INCINERATOR 2.5 Ton/Hr WASTE MATERIAL TREATMENT FACILITY DC CHEMICAL 2001
16 THERMAL OXIDIZER 9,000 Nm3/Hr V.O.C INCINERATION LG LCD P4 #3 2001
15 WASTE GAS INCINERATOR 300 Kg/Hr WASTE PLASTIC PLANT FACILITY ROYCO 2000
14 WASTE GAS INCINERATOR 6,800 Kg/Hr EDC / VCM PLANT HANWHA CHEMICAL 1999
13 CO2 INCINERATOR (V.O.C) 1,100,000 Kcal/Hr WASTE GAS INCINERATION KT & G 1998
12 MAN PROJECT INCINERATOR SYSTEM 22,000,000 Kcal/Hr WASTE GAS INCINERATION DAENONG PETRO CHEMICAL 1998
11 WASTE GAS FLARE STACK BURNER 100 Nm3/Hr WASTE GAS INCINERATION KOREA SYNTHETIC FIBER 1997
10 WASTE GAS FLARE STACK BURNER 100 Nm3/Hr WASTE GAS INCINERATION S.K IND. 1996
9 WASTE GAS INCINERATOR & HEAT MEDIUM BOILER SYSTEM 2,000,000 Kcal/Hr SOFT PITCH PLANT DONGSUE CHEMICAL 1998
8 INCINERATOR AUX. BURNER COMBUSTION SYSTEM 0.5 Ton/Hr G-7 PILOT PLANT KOLON ENG 1996
7 WASTE GAS FLARE STACK BURNER 100 Nm3/Hr WASTE GAS INCINERATION TAEKWANG IND. 1995
6 WASTE GAS FLARE STACK BURNER 150 Nm3/Hr K-2 PROJECT SANNAM PETRO CHEMICAL 1995
5 KIMPO RECLAIMED LAND FLARE STACK 200 Nm3/Hr KYENG SUE-DONG RECLAIMED LAND CH4 OIL INCINERATION KIMPO 1994
4 FLARE STACK & BURNER 10,000 Nm3/Hr COREX FACILITY POSCO 1992
3 FLARE STACK & BURNER 400 Nm3/Hr WASTE FUME GAS INCINERATION TEAYOUNG CHEM 1992
2 CARBON REGENERATION FACILITIES #3,4 1,500,000 Kcal/Hr CARBON REGENERATION FACILITY POSCO 1992
1 WASTE FUME INCINERATOR 3,000,000 Kcal/Hr CCL LINE FUME GAS INCINERATION YUNHAB STEEL 1992