76 UNIT NO.2 WHB REPLACEMENT

  • CLIENTGS CALTEX / KOREA
  • DATE2019
  • PRODUCTWASTE HEAT BOILER / SUPERHEATER
  • CAPACITY24 Ton/Hr x 44 Kg/cm2

KNPC CLEAN FUELS PROJECT

  • CLIENTKNPC / KUWAIT
  • DATE2015
  • PRODUCTWASTE HEAT BOILER
  • CAPACITY20Ton/Hr x 24Kg/cm2

RUWAIS REFINERY EXPANSION PROJECT

  • CLIENTTAKREER / UAE
  • DATE2011
  • PRODUCTWASTE HEAT BOILER
  • CAPACITY14.4 Ton/Hr x 52Kg/cm2

SOUTH YOLOTEN GAS FIELD DEVELOPMENT PROJECT

  • CLIENTTRUKMENGAS / TRUKMENISTAN
  • DATE2011
  • PRODUCTWASTE HEAT BOILER
  • CAPACITY39.4 Ton/Hr x 50Kg/cm2

#2 HOU PROJECT

  • CLIENTHYUNDAI OILBANK / KOREA
  • DATE2010
  • PRODUCTWASTE HEAT BOILER / SUPERHEATER
  • CAPACITY90 Ton/Hr x 48 Kg/cm2

NEW FCC PROJECT

  • CLIENTSK ENERGY / KOREA
  • DATE2008
  • PRODUCTWASTE HEAT BOILER / SUPERHEATER
  • CAPACITY95.5 Ton/Hr x 48 Kg/cm2
NO. PROJECT NAME CAPACITY DESCRIPTION CLIENT REMARK
41 HDO 2020 INCINERATOR REVAMPING PJT. 27Ton/Hr x 49Kg/cm2 WASTE HEAT BOILER (2 SETS) HYUNDAI OIL BANK 2019
40 HDO 2020 INCINERATOR REVAMPING PJT. 120Ton/Hr x 45.5Kg/cm2 STEAM SUPERHEATER HYUNDAI OIL BANK 2019
39 GSC-ESR18-1140 NO.2 WHB BOILER 24Ton/Hr x 30Kg/cm2 WASTE HEAT BOILER GS CALTEX 2018
38 S-OIL RUCP PROJECT 21Ton/Hr x 52Kg/cm2 WASTE HEAT BOILER HYUNDAI OIL BANK 2017
37 KARBARA REFINERY PROJECT 24Ton/Hr x 46Kg/cm2 WASTE HEAT BOILER SCOP(IRAQ) 2015
36 UKAN PROJECT 53Ton/Hr x 47Kg/cm2 WASTE HEAT BOILER LUKOIL UZBEKISTAN 2015
35 KNPC CLEAN FUEL PROJECT 20Ton/Hr x 24Kg/cm2 WASTE HEAT BOILER KNPC 2015
34 AEGEAN REFINERY PROJECT (STAR) 51Ton/Hr x 52Kg/cm2 WASTE HEAT BOILER SOCAR & TURCAS 2014
33 SOHAR REFINERY PROJECT (SRIP) 17Ton/Hr x 49Kg/cm2 WASTE HEAT BOILER ORPIC 2014
32 DUNG QUAT REFINERY PROJECT 2Ton/Hr x 10Kg/cm2 WASTE HEAT BOILER BINH SON REFINERY 2014
31 DUNG QUAT REFINERY PROJECT 0.2Ton/Hr x 10Kg/cm2 FINAL CONDENSER BINH SON REFINERY 2014
30 ARL UPGRADATION PROJECT 1.6Ton/Hr x 28.1 Kg/cm2 WASTE HEAT BOILER ATTOCK REFINERY LIMITED 2013
29 IRAQ BADRA OIL FIELD DEVELOPMENT PHASE 2 TRERMAL INCINERATOR PACKAGE 13.8Ton/Hr x 45 Kg/cm2 WASTE HEAT BOILER (2 SETS) Gazprom neft badra b.v. 2013
28 IRAQ BADRA OIL FIELD DEVELOPMENT PHASE 2 REACTION FURNACE PACKAGE 14Ton/Hr x 45 Kg/cm2 WASTE HEAT BOILER (2 SETS) Gazprom neft badra b.v. 2013
25 STC A2 PROJECT REACTION FURNACE PACKAGE 6.5Ton/Hr x 50Kg/cm2 WASTE HEAT BOILER (2 SETS) SAMSUNG TOTAL 2012
24 STC A2 PROJECT THERMAL OXIDIZER PACKAGE 8.5Ton/Hr x 46Kg/cm2 WASTE HEAT BOILER SAMSUNG TOTAL 2012
23 MUSANDAM GAS PLANT PROJECT REACTION FURNACE PACKAGE 4.7Ton/Hr x 41Kg/cm2 WASTE HEAT BOILER OOCEP 2012
22 MUSANDAM GAS PLANT PROJECT THERMAL OXIDIZER PACKAGE 7.5Ton/Hr x 41Kg/cm2 WASTE HEAT BOILER OOCEP 2012
21 SOUTH YOLOTEN GAS FIELD DEVELOPMENT PJT REACTION FURNACE PACKAGE 39.4Ton/Hr x 50Kg/cm2 WASTE HEAT BOILER (4 SETS) TRUKMENGAS 2011
20 SOUTH YOLOTEN GAS FIELD DEVELOPMENT PJT THERMAL OXIDIZER PACKAGE 74.6Ton/Hr x 50Kg/cm2 WASTE HEAT BOILER (4 SETS) TRUKMENGAS 2011
19 GAS DESULFURIZATION PLANT REACTION FURNACE PACKAGE 73.9Ton/Hr x 55Kg/cm2 WASTE HEAT BOILER (2 SETS) TRUKMENGAS 2010
18 GAS DESULFURIZATION PLANT THERMAL OXIDIZER PACKAGE 118.8Ton/Hr x 55Kg/cm2 WASTE HEAT BOILER (2 SETS) TRUKMENGAS 2010
17 RUWAIS REFINERY EXPANSION PROJECT DECOMPOSITION FURNACE PACKAGE 14.4Ton/Hr x 52Kg/cm2 WASTE HEAT BOILER (2 SETS) TAKREER 2011
16 4AA PROJECT INCINERATOR PACKAGE 8Ton/Hr x 7Kg/cm2 WASTE HEAT BOILER LG CHEM 2009
15 HDO #2 HOU PROJECT COMBUSTOR PACKAGE 36.4Ton/Hr x 54.1 Kg/cm2 WASTE HEAT BOILER (2 SETS) HYUNDAI OILBANK 2009
14 HDO #2 HOU PROJECT INCINERATOR PACKAGE 9Ton/Hr x 54.1Kg/cm2 WASTE HEAT BOILER HYUNDAI OILBANK 2009
13 RUWAIS NO.4 NGL PROJECT THERMAL REACTOR PACKAGE 3.8Ton/Hr x 9Bar WASTE HEAT BOILER GASCO 2010
12 GDP THERMAL OXIDIZER PACKAGE 2.65Ton/Hr x 52Kg/cm2 WASTE HEAT BOILER TAKREER 2009
11 GDP REACTOR FURNACE PACKAGE 10.6Ton/Hr x 52Kg/cm2 WASTE HEAT BOILER TAKREER 2009
10 NEW FCC PROJECT INCINERATOR PACKAGE 95.5Ton/Hr x 48Kg/cm2 WASTE HEAT BOILER SK ENERGY 2008
9 NEW FCC PROJECT COMBUSTOR PACKAGE 41Ton/Hr x 53Kg/cm2 WASTE HEAT BOILER (2 SETS) SK ENERGY 2007
8 WASTE WATER INCINERATION SYSTEM 17Ton/Hr x 45Kg/cm2 WASTE HEAT BOILER LG MMA 2006
7 MAN PLANT 7Ton/Hr x 45Kg/cm2 WASTE HEAT BOILER YONGSAN CHEMICAL 2005
6 WASTE HEAT RECOVERY SYSTEM 15Ton/Hr x 16Kg/cm2 WASTE HEAT BOILER BORNEO FURNITURE 2001
5 JC-4 PROJECT 1Ton/Hr x 20Kg/cm2 WASTE HEAT BOILER DC CHEMICAL 2001
4 WASTE GAS INCINERATION 15Ton/Hr x 45Kg/cm2 WASTE HEAT BOILER DAENONG PETRO CHEMICAL 1998
3 WASTE MATERIAL TREATMENT FACILITY 3Ton/Hr x 15Kg/cm2 WASTE HEAT BOILER WONKWANG 1996
2 WASTE MATERIAL TREATMENT FACILITY 2.5Ton/Hr x 10Kg/cm2 WASTE HEAT BOILER DAE IL DEV. 1995
1 WASTE SLUDGE INCINERATION 2Ton/Hr x 25Kg/cm2 WASTE HEAT BOILER IL KUK HEAVY IND. 1992